  • Site cleaning
  • Temporary Shed Construction
  • Foundation Digging
    •  Soil digging for Pillars
    •  Soil digging for foundation
  • Start carpenter work
  • Footing and Pillar Base
  • Pillars until Plinths
  • Stone Foundation
  • Plinth beam
  • Fill soil inside Plinth area.
  • Setting up main door frame and other room door frames
  • Wall construction until window frame base
  • Setup all window frames
  • Setup lintel and saja
  • Wall construction until beams
  • Setup kitchen ventilators for exhaust fans OR bathroom ventilators
  • Bar bending work for beams and roof
    •  Inverter beams
  • Storing Water on top of roof
  • Electric pipes
    •  Clear any blockage in the roof pipes
    •  Laying electric pipes in the walls and setup electric boxes
  • Plumbing work for kitchen and bathroom
    •  Setup water pipes and sewage pipes
    •  Setup Indian latrine
    •  Water proofing for bathrooms
    •  Close all water and sewage pipes with temporary caps
  • Setup kitchen platform and sink
  • Tiles laying in bathroom and kitchen for walls
  • Plastering of roof and walls inside
  • Plastering of outside walls
  • Applying putty for window frames
  • Fixing window frames
  • Granite and Marble Lying
  • Granite tiles Laying in bathroom
  • Fixing Bathroom Fittings
  • Finishing outside plumbing work and tank
  • House Elevation
  • Painting
    • Interior Painting
    • Exterior Painting
    • Decorated Painting
    • Wallpaper Fixing
  • Electric work
    •  Electrical wiring
    •  Dummy plate fixing/ electrical holders
    •  Electrical switches and Socket setup
  • Laying electric service wire from pole to meter board
  • Fixing meters in panel board.
  • Digging pit for power earth
  • Digging pit
  • Motor & connection to tank
  • Sewage lines to pit
  • Parking tiles
  • Compound wall